For an optimal viewing experience, it is recommended to view this website on the latest versions of IE, Firefox, Chrome or Safari.
Design and construction of peripheral wall system and pile foundation works (800 mm thick temporary diaphragm wall, 96 nos. 2m to 2.5m dia. bored piles and 249 nos. socketed H pile)