For an optimal viewing experience, it is recommended to view this website on the latest versions of IE, Firefox, Chrome or Safari.
The scope of the project was to carry out site formation and foundation works. The construction site was located at a steep hillside which had an elevation difference of 45m, project team built a platform with the size of 2200 square meter comprising 2400 tons of structural steel members and its maximum loading capacity was 9680 tons.